Bloor–Yonge Station opened on March 30, 1954 and has grown into the TTC’s busiest and most important interchange, linking the Yonge–University line with Line 2 Bloor–Danforth. Sitting at the crossroads of two major subway corridors, the station handles a constant flow of riders transferring between north–south and east–west travel, making it one of the central pillars of Toronto’s transit network. The surrounding area blends dense residential towers, office buildings, and a major retail strip that keeps foot traffic high from morning to night.
Inside, the station reflects multiple eras of TTC growth, with older mid-century architecture meeting later expansions built to handle increasing passenger volumes. Platforms can feel crowded during peak periods, especially at the interchange points where riders funnel between the two lines. Despite its intensity, Bloor–Yonge is a defining part of Toronto’s transit experience—an essential hub where the city’s movement converges every day.
Station Photos